HAVE AI NEWS HAVE AI NEWS
tg subscribe
Business

How AstraZeneca Turned Forced CRM Import Substitution into the Large-Scale NOVA Digital Ecosystem

How AstraZeneca Turned Forced CRM Import Substitution into the Large-Scale NOVA Digital Ecosystem

The story of the NOVA project: the localization of a corporate CRM driven by sanctions shutdown risks evolved over four years into an independent platform featuring a mobile client, generative AI, and in-house development teams.

The forced replacement of foreign software often comes down to replicating the basic functions of discontinued services. However, the case of AstraZeneca's Russia and Eurasia division demonstrated a different scenario: an emergency 2022 business continuity project transformed into the NOVA technology platform, which not only completely replaced the global CRM but also surpassed it in functionality.

Large-Scale Launch in 12 Months

The main prerequisite for development in 2022 was the risk of an immediate shutdown of the global solution, which hosted all operational activities: from coordinating visits to healthcare professionals to logging communication outcomes. The project was launched with the involvement of a technology partner.

Throughout 2023, the team designed a mobile application from scratch—a critical tool for field employees. The deployment pace was indicative:

  • Autumn 2023: Pilot release (MVP) for the first 120 users across two teams;
  • Late 2023: Scaling up training, covering about 1,200 specialists;
  • Early 2024: Complete phase-out of the global CRM;
  • July 2024: Completion of the transition for all remaining specialists, including around 200 medical advisors and scientific experts, for whom specialized functional modules were created.

Technical Challenges: The Struggle for Mobile Stability

At the start of commercial operation, the greatest difficulty came not from business logic or interface design, but from data exchange reliability. The application needed to continuously coordinate the mobile device, local database, backend, and web portal.

Developers had to address non-standard scenarios: internet disconnections, the operating system forcibly closing the app due to memory shortages, and even manual time adjustments on tablets. The first quarter of 2024 was entirely focused on stabilizing synchronization and revising testing procedures for real-world field conditions.

A Single Digital Window Instead of Disparate Services

Having achieved stable performance, NOVA began absorbing related business tasks. Analytics of disease journey stages (from initial detection to therapy regimens) were built into the system, enabling medical representatives to prepare more accurately for dialogue with healthcare professionals.

The platform integrated a partner contact center and publicly accessible directories of medical professionals and organizations (in compliance with regulatory requirements and personal data processing consent procedures). This allowed decommissioning a separate database exchange infrastructure. Simultaneously, the rollout of dynamic QR codes and personalized materials reduced the need for printed collateral.

AIRIS Artificial Intelligence and Process Automation

By 2026, the focus shifted from information accumulation to predictive analytics. Key technological innovations spanned several areas:

  • AIRIS Assistant: A cross-platform chatbot that began as a CRM interface helper and evolved into the company's unified corporate knowledge hub;
  • Smart Meeting Preparation: An AI-based module generates a personalized summary of specialist data before a visit;
  • Intelligent Logistics: An algorithm for planning visit schedules taking into account traffic conditions, geography, vacations, and contact frequency;
  • Documentation Control: Utilization of machine learning algorithms to verify presentations for compliance with internal standards and preliminary document recognition for events.

In-House Development and Independent Infrastructure

In 2025, the company completed the migration of NOVA to its own technological capacity, eliminating dependency on third-party external platforms. The success of the architectural overhaul was confirmed by industry awards: the project was named the Best BPM Project of 2024, and in 2025 it earned the "Project of the Year" title.

By 2026, three specialized engineering teams were operating within the company: two develop the CRM core and mobile client, while the third is migrating business event organization functionality into the system from legacy setups. The next technical milestone will be accelerating the release cycle by switching to regular bi-weekly update shipments.

Author: AstraZeneca

Source: habr.com

Autonomous Agents Inside OpenAI: How Artificial Intelligence Is Accelerating Its Own Research
Research

Autonomous Agents Inside OpenAI: How Artificial Intelligence Is Accelerating Its Own Research

OpenAI has reported on the effectiveness of its internal AI assistants: software agents complete more than three days’ worth of work in a single human workday, while token costs reach thousands of dollars per employee.

M&T Bank’s Experience: How a Large-Scale IT Modernization Paved the Way for Generative AI for 15,000 Employees
Business

M&T Bank’s Experience: How a Large-Scale IT Modernization Paved the Way for Generative AI for 15,000 Employees

U.S. regional bank M&T Bank has deployed enterprise AI tools to most of its workforce. The impact is already visible in practice: call center interactions are processed six minutes faster per call.

Digital Scribe for Doctors: Why Protocol Automation Will Bring Billions to Insurers
Business

Digital Scribe for Doctors: Why Protocol Automation Will Bring Billions to Insurers

While the industry debates AI's diagnostic capabilities, automated medical record filling is quietly reshaping healthcare economics and the rules of voluntary health insurance.

From Smart Assistant to AI-Native: 5 Stages of AI Evolution in Corporate Processes
Business

From Smart Assistant to AI-Native: 5 Stages of AI Evolution in Corporate Processes

Most companies get stuck at the stage of launching simple bots, facing escalating costs and failures. We break down the five-level workflow transformation model—from personal assistants to end-to-end AI-Native systems.

The Human Factor in the Age of AI: What Will Be Discussed at INFOSTART A&PM EVENT 2026
Education

The Human Factor in the Age of AI: What Will Be Discussed at INFOSTART A&PM EVENT 2026

The rise of AI assistants has not eliminated the need for human dialogue: INFOSTART A&PM EVENT 2026 moderators explained why resolving conflicts and building effective communication are becoming the main factors in saving deadlines and budgets in IT.

Meta Expands Muse AI Agent with Enterprise Software Connectors for Small Businesses
Business

Meta Expands Muse AI Agent with Enterprise Software Connectors for Small Businesses

Meta integrates commercial connectors into its Muse AI agent, letting small enterprises automate workflows through chat and sync account data with daily tasks.